Last 03/08/15

Guitar Build Diary for:
Miguel Elizondo


Model: H1a 1937 Segovia/Hauser

Specifications:

Fitting the coverd vee head joint.

Detailing the head.

Front view.

Back view.

Gluing back braces.

Back complete.

Gluing tail block to soundboard and sides. Neck attached to soundboard.

Soaking back linings before bending.

Tentalones glued to attach sides to the top.

Ready for back lining.

Dedication to Miguel Elizondo prior to gluing the back on.

Gluing the back on.

Top binding and purfling channels cut.

Fingerboard glued on.

Final sanding. Preparing for finishing.

Making the bridge.

Bridge

Bridge

Preparing to pin the bridge.

Pinning the bridge in position.

Locating pins in the bridge and locating holes in soundboard.

Finishing the bridge.

First coat of finish on the neck and body.

Final coats of finish applied.

Last coat of finish. Time for curing stage.

Gluing the bridge!

Final session of French polish to the soundboard.Waiting to buff out finish.

Buffed out and ready for set-up.

V-joint.

Strung up and ready to ship out!

Back.

Strings on and set-up. Preparing to ship out!



Your are visitor
39
since July 15, 2014

Home